GOVERNMENT OF MADHYA PRADESH

    MADHYA PRADESH RURAL ROAD DEVELOPMENT AUTHORITY
(AN AGENCY OF PANCHYAT & RURAL DEVELOPMENT DEPARTMENT, GOVT. OF M.P.)

5th Floor, Block-II, Paryavas Bhawan,  BHOPAL M.P. – 462 004

 

DETAILED NOTICE INVITING TENDER FOR DPR CONSULTANCY 

No. 16364/22/D-12/DPR-Cons/MPRRDA/11                           Bhopal, Date :17/11/2011                            

NOTICE INVITING OFFERS FROM CONSULTANTS FOR PREPARATION OF DETAILED PROJECT REPORT FOR ROADS/BRIDGES (D.P.R.) UNDER CMGSY 

Sealed tenders are invited from the reputed Consultants for survey, investigation and preparation of DPR for one or more consultancy packages of Rural Roads under Mukhya Mantri Gram Sadak Yojna in Madhya Pradesh as per details in the table given below:- 

S.No.

Package No.

NAME OF DISTRICT

NAME OF PIU

Tentative Road Length ( in Km.)

EMD  ( in Rs. )        

1

2

3

4

5

6

1

1/CMGSY/11

Balaghat

Balaghat

101.50

20300

2

7/CMGSY/11

Narsinghpur

Narsinghpur

355.15

71030

 

1.    The consultants who have successfully completed preparation of D.P.R. of any one project more than Rs.50 crores (minimum 200 km of rural roads) in any one year during last five year are eligible for participation in the tenders. However, for packages having road length more than 400 Kms. qualification criteria will be as detailed in LOI (tender document) and other conditions for award of work will be as per LOI.

2.     Consultants who have been allotted work of DPR preparation during last one year but not completed work within time limit are not eligible to participate in the tenders. Consultant should, therefore, enclose details of the work allotted to them in last one year with date of completion duly certified by GM. No consultant will be allotted work of more than 2 packages including work in hand.

3.     The financial proposals are invited per Km. of road length inclusive of all Cross Drainage works/Bridges/VCW/FCWs. Estimates of concrete road shall also be prepared for such road as may be identified by the PIU. DPR should comply all the requirements of DPR template prepared for PMGSY roads.

4.      The time limit for completion of consultancy service is 3 Months including   rainy season from the date of Work Order.

DPRs should be submitted in batches as per priority decided by GM PIU and the whole work is to be completed within the time limit specified above. 

5.      SPECIAL CONDITIONS

5.1  Consultant will arrange survey of all the roads in consultation with GM PIU  so that the levels can be verified by engineer of PIU and will submit certified  level books along with PPR.

5.2  The location and type of cross drainage structure longer than 10mts are to be finalized in consultation with representative of PIU.

5.3 Consultant will have to submit the certificate duly countersinged by GM that the number of CD structures provided in DPR is as per site  requirement and there will be no change at the time of execution.

5.4  Photographs of road alignment at  every 100 m interval are to be placed in DPR.

5.5  Transact walk strip plan of existing road alignment alongwith all roadside details are to be given.

6   Road length given is tentative. There may be variation up to + 25%.

7  The bid documents can be purchased up to 4.00 pm on 29/11/2011 from the Office,        MPRRDA Paryavas Bhavan Bhopal. On payment of Rs. 2000/- for each package by DD or Cash. Bid document may also be downloaded from our web site  www.mprrda.com. In such case cost of bid document will have to be submitted in the form of DD with tender.

8  Last date of receipt of completed offers is  30/11/2011 upto 3.00 P.M. and will be opened           on the same day at 3.30 P.M. in the presence of consultant(s) representative(s) who choose to be present. The Technical Evaluation will be done first and financial offers of only qualified bidders will be opened on 02/12/2011 at 3.30 P.M. in presence of consultant(s) representative(s) who choose to be present. The decision of the competent authority in regard to technical evaluation shall be final, binding and conclusive.

        

         Chief General Manager
   Madhya Pradesh Rural Road Development
 Authority,  Bhopal